Monday, May 25, 2009

Day 21 - (25th May) Stainless steel backing installed and Wrought Iron Gate measurements taken ...

I called Jason in the morning asking him about the laminates for the cabinets and the painting. Ended up, Jason and 肥子 came to install the stainless steel backing themselves. The only grouse we had was that the gap for 1 joint was rather huge ... which Jason said he will level up using Silicone ... I also noticed that Jason only applied glue along the 4 sides of the stainless steel plates unlike my previous installer who would apply lots of glue even in the centre... As a result, when i tried to test the stainless steel plates, it wobbled .... Uncle has called Jason to rectify ...

Jason also said that the remaining electrical works and touch up of the painting would be done on thursday. The surprise is that he would do the painting himself ... as his workers are all tied up at various locations !

Ah Hock's worker also dropped by to take measurements for our new wrought iron gate as our old aluminum gate was more than 21 years old now .... haha ...

Pics from Day 21 -

Stainless steel backings to be installed ...

Applying the glue (notice that it's not on the entire surface?)

Jason fitting the stainless steel backing on the wall ...

Taking measurements for the gate

Pictures of the new gate ...

From Wan Sern

No comments:

Post a Comment